Skip to main content

Heathrow Connect Contents Company Operations Replacement by TfL Rail References Navigation menu[update]e[update]"Mayor of London announces TfL fares will apply to Elizabeth Line"the original"Heathrow Connect close to takeoff"the original"Heathrow ... at a price"Airport Workers"Crossrail Airport Junction Information Paper"BAA invests in rail so cars don't choke airport growthHeathrow Express"Heathrow Connect - Train Times"the original"Elizabeth line""TfL Rail"Crossrail Class 345 contingency applicationeeeHeathrow Airport Website

Airport rail links in LondonRailway operators in LondonTransport in the London Borough of EalingTransport in the London Borough of HillingdonRailway services introduced in 2005Railway services discontinued in 2018Train operating companies in the United KingdomTransport at Heathrow Airport2005 establishments in England2018 disestablishments in England


LondonHeathrow ExpressGreat Western RailwayPaddington stationHeathrow AirportHeathrow ExpressTfL RailElizabeth lineHeathrow Airport HoldingsHeathrow ExpressHayes & HarlingtonOyster cardsTravelcardsFreedom PassesLondon UndergroundGreat Western Main LineFirst Great Western Linkelectrified25 kV ACAutomatic Train ProtectionflyoverCrossrailHeathrow CentralTerminal 5Terminal 4Class 360/2electric multiple unitsSiemens MobilityKrefeldAngel TrainsDesirosNorthampton Kings Heath Siemens DepotSouth West TrainsClass 450sWildenrath Test CentreElizabeth lineShenfieldAbbey WoodClass 345sHeathrow Connect












Heathrow Connect




From Wikipedia, the free encyclopedia






Jump to navigation
Jump to search


Train service in London

















Heathrow Connect
HeathrowConnectVector.svg

360204 at Ealing Broadway.jpg

Class 360 Desiro at Ealing Broadway in 2011

Overview
Franchise(s)
Open access operator
Not subject to franchising
12 June 2005 - 19 May 2018
Main route(s)
London Paddington – Heathrow Airport
Fleet size5 Class 360s
Stations called at8
National Rail abbreviationHC
SuccessorTfL Rail
Parent company
Heathrow Airport Holdings
First Great Western

Heathrow Connect was a train service in London provided jointly by Heathrow Express and Great Western Railway (GWR), between Paddington station and Heathrow Airport. The service followed the same route as the non-stop Heathrow Express service but called at certain intermediate stations, connecting several locations in West London with each other, the airport, and Central London. It ran every half-hour throughout the day and evening. The service was launched on 12 June 2005 and ceased on 19 May 2018, when it was absorbed into the TfL Rail franchise,[1] ahead of becoming part of the Elizabeth line in autumn 2019.




Contents





  • 1 Company

    • 1.1 Structure


    • 1.2 Fares



  • 2 Operations

    • 2.1 Route


    • 2.2 Rolling stock



  • 3 Replacement by TfL Rail


  • 4 References




Company



Structure


Heathrow Connect had a complex operating structure: Heathrow Airport Holdings (formerly the BAA) supplied the rolling stock and on-board staff through its Heathrow Express subsidiary, and owned the track from Airport Junction to the terminals. The GWR collected the revenue for journeys between Paddington and Hayes & Harlington, while Heathrow Airport Holdings collected the revenue for journeys between Hayes & Harlington and the terminals.[2]



Fares


Fares between Paddington and Hayes & Harlington were the same as for GWR services, but the single fare between Hayes and Heathrow was £6.30 as of January 2018[update]. Oyster cards, Travelcards and Freedom Passes were not valid between Hayes & Harlington and Heathrow, but could be used throughout the rest of the route. When the service was first introduced in 2005, the fare for the 3-mile (4.8 km) journey from Hayes to Heathrow was £6, which at £2 per mile made it one of the most expensive train journeys in the world.[3]


The service was designed principally for the use of airport staff and West London residents for travel to Heathrow or Paddington. With a staff ID card, discounted fares were available for the journey between Hayes and Heathrow.[4]


Heathrow Connect was marketed as a cheaper way to reach Paddington from Heathrow and vice versa, with a single fare of £10.30 (less than half the Heathrow Express fare, but almost double the price of a London Underground journey) and a journey time of 25 minutes against the Express time of 15 minutes. Passengers were also permitted to use their Railcards to access discounts. Originally it was not intended to be used as a cheaper (but slower) alternative to the Heathrow Express service from Paddington to Heathrow: every Connect service was overtaken by an Express service en route, and at Paddington trains were originally advertised on departure boards as running to Hayes & Harlington only. Standard-class travel between Heathrow Airport terminals was free, and this included Heathrow Connect services.



Operations



Route


.mw-parser-output .RMboxbox-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2).mw-parser-output .RMinlinefloat:none;width:100%;margin:0;border:none.mw-parser-output table.routemappadding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto.mw-parser-output .RMirborder:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important.mw-parser-output table.routemap .RMsidisplay:inline;font-size:90%.mw-parser-output table.routemap .RMl1padding:0 3px;text-align:left.mw-parser-output table.routemap .RMr1padding:0 3px;text-align:right.mw-parser-output table.routemap .RMltext-align:right.mw-parser-output table.routemap .RMrtext-align:left.mw-parser-output table.routemap .RMl4padding:0 3px 0 0;text-align:left.mw-parser-output table.routemap .RMr4padding:0 0 0 3px;text-align:right.mw-parser-output table.routemap>tbody>trline-height:1.mw-parser-output table.routemap>tbody>tr>tdpadding:0;width:auto;vertical-align:middle;text-align:center.mw-parser-output .RMir>tbody>trdisplay:inline-table.mw-parser-output .RMir>tbody>tr>tdpadding:0;height:20px;min-height:20px.mw-parser-output .RMir .RMovposition:relative.mw-parser-output .RMir .RMicposition:absolute;left:0px;top:0px;padding:0.mw-parser-output .RMir .RMtxline-height:20px;vertical-align:middle;text-align:center.mw-parser-output .RMir .RMspheight:20px;min-height:20px.mw-parser-output .RMir div>.RMtxposition:absolute.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>divline-height:.975;display:inline-block;vertical-align:middle.mw-parser-output .RMir .RMf_height:5px;min-height:5px;width:20px;min-width:20px.mw-parser-output .RMir .RMfmheight:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto.mw-parser-output .RMir .RMowidth:2.5px;min-width:2.5px.mw-parser-output .RMir .RMcwidth:5px;min-width:5px.mw-parser-output .RMir .RMocwidth:7.5px;min-width:7.5px.mw-parser-output .RMir .RMdwidth:10px;min-width:10px.mw-parser-output .RMir .RModwidth:12.5px;min-width:12.5px.mw-parser-output .RMir .RMcdwidth:15px;min-width:15px.mw-parser-output .RMir .RMocdwidth:17.5px;min-width:17.5px.mw-parser-output .RMir .RM_width:20px;min-width:20px.mw-parser-output .RMir .RM_owidth:22.5px;min-width:22.5px.mw-parser-output .RMir .RM_cwidth:25px;min-width:25px.mw-parser-output .RMir .RM_ocwidth:27.5px;min-width:27.5px.mw-parser-output .RMir .RM_dwidth:30px;min-width:30px.mw-parser-output .RMir .RM_odwidth:32.5px;min-width:32.5px.mw-parser-output .RMir .RM_cdwidth:35px;min-width:35px.mw-parser-output .RMir .RM_ocdwidth:37.5px;min-width:37.5px.mw-parser-output .RMir .RMbwidth:40px;min-width:40px.mw-parser-output .RMir .RMcbwidth:45px;min-width:45px.mw-parser-output .RMir .RMdbwidth:50px;min-width:50px.mw-parser-output .RMir .RMcdbwidth:55px;min-width:55px.mw-parser-output .RMir .RM_bwidth:60px;min-width:60px.mw-parser-output .RMir .RM_cbwidth:65px;min-width:65px.mw-parser-output .RMir .RM_dbwidth:70px;min-width:70px.mw-parser-output .RMir .RM_cdbwidth:75px;min-width:75px.mw-parser-output .RMir .RMswidth:80px;min-width:80px.mw-parser-output .RMir .RMdswidth:90px;min-width:90px.mw-parser-output .RMir .RM_swidth:100px;min-width:100px.mw-parser-output .RMir .RM_dswidth:110px;min-width:110px.mw-parser-output .RMir .RMbswidth:120px;min-width:120px.mw-parser-output .RMir .RMdbswidth:130px;min-width:130px.mw-parser-output .RMir .RM_bswidth:140px;min-width:140px.mw-parser-output .RMir .RM_dbswidth:150px;min-width:150px.mw-parser-output .RMir .RMwwidth:160px;min-width:160px.mw-parser-output .RMir .RM_wwidth:180px;min-width:180px.mw-parser-output .RMir .RMbwwidth:200px;min-width:200px.mw-parser-output .RMir .RM_bwwidth:220px;min-width:220px.mw-parser-output .RMir .RMswwidth:240px;min-width:240px.mw-parser-output .RMir .RM_swwidth:260px;min-width:260px.mw-parser-output .RMir .RMbswwidth:280px;min-width:280px.mw-parser-output .RMir .RM_bswwidth:300px;min-width:300px

Heathrow Connect used the relief lines of the Great Western Main Line between Paddington and Airport Junction, replacing some stopping services operated by First Great Western Link. As part of the original Heathrow Express project, these lines were electrified at 25 kV AC overhead as a diversionary route, and feature Automatic Train Protection. An additional flyover bridge was built in 2008 as part of Crossrail works to enable trains to enter or leave the airport spur without crossing any of the Great Western Main Line tracks.[5]


Services initially terminated at Heathrow Central. Following Heathrow Express services being diverted to Terminal 5, from March 2008 Heathrow Connect services were extended to Terminal 4.[6][7]


The service pattern, as of October 2016[update], was as follows:


  • Monday-Saturday, Heathrow Connect services ran half-hourly between Paddington and Heathrow Central (for terminals 2 & 3), stopping at Ealing Broadway, West Ealing, Hanwell, Southall and Hayes & Harlington. In early mornings and late evenings, some Heathrow Connect services were extended beyond Heathrow Central to either Terminal 4 or Terminal 5.[8]

  • On Sundays, all Heathrow Connect services were extended to Terminal 4, but did not call at West Ealing or Hanwell. Service frequency was also reduced from half-hourly to hourly.[8]


Rolling stock


Heathrow Connect used five-car Class 360/2 electric multiple units. Four were built by Siemens Mobility in Krefeld, Germany for Angel Trains as demonstrator Desiros. One was brought to Northampton Kings Heath Siemens Depot in 2002 before South West Trains' Class 450s were delivered. The others were used at the Wildenrath Test Centre.[9]


All four were purchased by Heathrow Connect and rebuilt before being sent to England.[10][11] A fifth five-car set was delivered in November 2005, but did not enter service until December 2006.[12] A fifth carriage was added to the original four four-car sets in 2006.[13][14]

























Class
Image
Type
Top speed
Quantity
Number
Carriages
Seat Layout
Routes operated
Built
mph
km/h

Class 360/2 Desiro

Hugh llewelyn 360 201 (6341449982).jpg

Electric multiple unit
100
161
5
360201-360205
5
2+3

London Paddington – Heathrow Terminal 5
2004–2005

Class 360 Heathrow Connect Diagram.PNG


Replacement by TfL Rail




TfL Rail Roundel


On 20 May 2018, TfL Rail took over the services operated by Heathrow Connect as a precursor to the full opening of the Elizabeth line.[15][16] Fares on the line are now integrated into the TfL fare scheme, and therefore match the fare scheme of London Underground services,[17] with the exception of a premium for single journeys to and from Heathrow using Pay As You Go (Oyster and contactless). Passengers are able to use Oyster cards, Travelcards and Freedom Passes to travel between Hayes & Harlington and Heathrow.


From December 2019 the service will be re-branded as the Elizabeth line and train paths will be extended through the new tunnels at Paddington through Central London, calling at stations such as Bond Street, Liverpool Street and Canary Wharf. When the line opens fully, eastbound trains from Heathrow will terminate at Shenfield or Abbey Wood.[15]


TfL Rail had originally planned to replace the existing Class 360 units with Class 345s, but due to delays with the signalling system in the Heathrow Airport tunnels and late delivery of Class 345 units, a contingency plan has been implemented. The Class 360s will continue to be used between London Paddington and Heathrow, supplemented by two Class 345 trains per hour running between London Paddington and the extended bay platform at Hayes & Harlington,[18] until the Class 360s can be fully replaced.



References




  1. ^ "Mayor of London announces TfL fares will apply to Elizabeth Line" (Press release). Transport for London. 16 March 2018. Archived from the original on 6 November 2018. Retrieved 22 March 2018..mw-parser-output cite.citationfont-style:inherit.mw-parser-output .citation qquotes:"""""""'""'".mw-parser-output .citation .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .citation .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-ws-icon abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center.mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-maintdisplay:none;color:#33aa33;margin-left:0.3em.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  2. ^ "Heathrow Connect close to takeoff". Railway Gazette. Sutton: Railway Gazette International. 1 June 2004. Archived from the original on 24 June 2019. Retrieved 24 June 2019.


  3. ^ "Heathrow ... at a price". The Observer. London. 12 June 2005. Retrieved 26 October 2009.


  4. ^ Airport Workers Heathrow Connect


  5. ^ "Crossrail Airport Junction Information Paper" (PDF). 10 January 2008.


  6. ^ BAA invests in rail so cars don't choke airport growth Railway Gazette International April 2005


  7. ^ Heathrow Express Railway Technlogy


  8. ^ ab "Heathrow Connect - Train Times". Archived from the original on 14 May 2018. Retrieved 21 August 2015.


  9. ^ Class 350s could be rebuilt Rail issue 472 15 October 2003 page 6


  10. ^ 360s to use old bodies Rail issue 484 31 March 2004 page 24


  11. ^ Heathrow Connect plans revealed Entrain issue 31 July 2004 page 38


  12. ^ Final Hex 360 arrives Today's Railways UK issue 50 February 2006 page 57


  13. ^ Fifth coaches arrive for Hex 360s Today's Railways UK issue 62 February 2007 page 62


  14. ^ New 360/2 Vehicles Arrive Rail issue 559 14 February 2007 page 55


  15. ^ ab "Elizabeth line". Transport for London. Retrieved 28 April 2017.


  16. ^ "TfL Rail". Transport for London. Retrieved 28 April 2017.


  17. ^ https://www.oyster-rail.org.uk/2018/03/elizabeth-line-fares-announced/


  18. ^ Crossrail Class 345 contingency application



Media related to Heathrow Connect at Wikimedia Commons













Retrieved from "https://en.wikipedia.org/w/index.php?title=Heathrow_Connect&oldid=906439831"










Navigation menu



























(RLQ=window.RLQ||[]).push(function()mw.config.set("wgPageParseReport":"limitreport":"cputime":"0.928","walltime":"1.236","ppvisitednodes":"value":9184,"limit":1000000,"ppgeneratednodes":"value":0,"limit":1500000,"postexpandincludesize":"value":170385,"limit":2097152,"templateargumentsize":"value":3848,"limit":2097152,"expansiondepth":"value":19,"limit":40,"expensivefunctioncount":"value":5,"limit":500,"unstrip-depth":"value":1,"limit":20,"unstrip-size":"value":29521,"limit":5000000,"entityaccesscount":"value":0,"limit":400,"timingprofile":["100.00% 890.920 1 -total"," 49.07% 437.142 1 Template:Heathrow_rail_services"," 48.68% 433.682 1 Template:Routemap"," 30.18% 268.898 30 Template:Rint"," 13.47% 119.985 1 Template:Reflist"," 7.81% 69.557 1 Template:Cite_press_release"," 6.72% 59.850 1 Template:Infobox_rail_company"," 5.06% 45.087 1 Template:Infobox"," 4.75% 42.310 1 Template:Short_description"," 4.64% 41.307 1 Template:Convert"],"scribunto":"limitreport-timeusage":"value":"0.203","limit":"10.000","limitreport-memusage":"value":7890467,"limit":52428800,"cachereport":"origin":"mw1319","timestamp":"20190724145558","ttl":2592000,"transientcontent":false););"@context":"https://schema.org","@type":"Article","name":"Heathrow Connect","url":"https://en.wikipedia.org/wiki/Heathrow_Connect","sameAs":"http://www.wikidata.org/entity/Q1592596","mainEntity":"http://www.wikidata.org/entity/Q1592596","author":"@type":"Organization","name":"Contributors to Wikimedia projects","publisher":"@type":"Organization","name":"Wikimedia Foundation, Inc.","logo":"@type":"ImageObject","url":"https://www.wikimedia.org/static/images/wmf-hor-googpub.png","datePublished":"2005-07-19T12:32:08Z","dateModified":"2019-07-15T21:04:14Z","image":"https://upload.wikimedia.org/wikipedia/commons/e/ef/360204_at_Ealing_Broadway.jpg","headline":"train service in London"(RLQ=window.RLQ||[]).push(function()mw.config.set("wgBackendResponseTime":93,"wgHostname":"mw1263"););

Popular posts from this blog

Category:9 (number) SubcategoriesMedia in category "9 (number)"Navigation menuUpload mediaGND ID: 4485639-8Library of Congress authority ID: sh85091979ReasonatorScholiaStatistics

Circuit construction for execution of conditional statements using least significant bitHow are two different registers being used as “control”?How exactly is the stated composite state of the two registers being produced using the $R_zz$ controlled rotations?Efficiently performing controlled rotations in HHLWould this quantum algorithm implementation work?How to prepare a superposed states of odd integers from $1$ to $sqrtN$?Why is this implementation of the order finding algorithm not working?Circuit construction for Hamiltonian simulationHow can I invert the least significant bit of a certain term of a superposed state?Implementing an oracleImplementing a controlled sum operation

Magento 2 “No Payment Methods” in Admin New OrderHow to integrate Paypal Express Checkout with the Magento APIMagento 1.5 - Sales > Order > edit order and shipping methods disappearAuto Invoice Check/Money Order Payment methodAdd more simple payment methods?Shipping methods not showingWhat should I do to change payment methods if changing the configuration has no effects?1.9 - No Payment Methods showing upMy Payment Methods not Showing for downloadable/virtual product when checkout?Magento2 API to access internal payment methodHow to call an existing payment methods in the registration form?