How can I avoid subordinates and coworkers putting off tasks until the last minute, then having no time for revisions?How to deal with dramatic and over-alarmed employees?Can I tell my boss off on my last day and how should I handle this situation?How to, and whether, to avoid telling manager embarrassing reason for one-time latenessHow to get coworker to own up to his mistakes?I applied for a job where I don't meet the academic grade requirement. How can I avoid sending in my transcript?What can I do to stop a non-supervisor manager busybody from constantly checking on me?Am I responsible for the work produced by coworkers since we are a team even though they excluded me?Is this ordinary workplace experiences for a job in Software Engineering?

Can multiple outlets be directly attached to a single breaker?

How to redirect stdout to a file, and stdout+stderr to another one?

Should generated documentation be stored in a Git repository?

Help understanding this line - usage of くれる

Single word that parallels "Recent" when discussing the near future

Formal Definition of Dot Product

Do we have C++20 ranges library in GCC 9?

How to disable Two-factor authentication for Apple ID?

How to make a not so good looking person more appealing?

Alias for root of a polynomial

Would life always name the light from their sun "white"

A case where Bishop for knight isn't a good trade

Re-testing of regression test bug fixes or re-run regression tests?

Ansible: use group_vars directly without with_items

What information exactly does an instruction cache store?

Were any of the books mentioned in this scene from the movie Hackers real?

Why can't I share a one use code with anyone else?

Why did the metro bus stop at each railway crossing, despite no warning indicating a train was coming?

Why does SSL Labs now consider CBC suites weak?

Can my Serbian girlfriend apply for a UK Standard Visitor visa and stay for the whole 6 months?

Use of さ as a filler

Is this possible when it comes to the relations of P, NP, NP-Hard and NP-Complete?

Adding labels and comments to a matrix

Was the dragon prowess intentionally downplayed in S08E04?



How can I avoid subordinates and coworkers putting off tasks until the last minute, then having no time for revisions?


How to deal with dramatic and over-alarmed employees?Can I tell my boss off on my last day and how should I handle this situation?How to, and whether, to avoid telling manager embarrassing reason for one-time latenessHow to get coworker to own up to his mistakes?I applied for a job where I don't meet the academic grade requirement. How can I avoid sending in my transcript?What can I do to stop a non-supervisor manager busybody from constantly checking on me?Am I responsible for the work produced by coworkers since we are a team even though they excluded me?Is this ordinary workplace experiences for a job in Software Engineering?






.everyoneloves__top-leaderboard:empty,.everyoneloves__mid-leaderboard:empty,.everyoneloves__bot-mid-leaderboard:empty margin-bottom:0;








26















I’ve had a recurring problem with people I work with leaving things until the last minute, then when there are problems, having no time to address them. Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”. I don’t really want to resort to complaining to higher management because that just makes things worse for the other person rather than fixing the problem.



Edit: I've had a number of questions asking about my relationship with the others, and this happens in several situations:



  • Actual subordinates - but this is relatively rare as a problem.

  • Same level coworkers, usually where we are in a team formed by request from higher up.

  • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.









share|improve this question
























  • What "problems" are you encountering after they deliver? Is it issues with their code or integration issues or ??? Maybe the problem isn't with them, it's with moving requirements, etc.?

    – JeffC
    May 9 at 21:20











  • “Deadlines for “drafts” or similar sometimes work but are often disregarded” — hey, I spotted your problem.

    – Paul D. Waite
    May 9 at 22:21






  • 5





    I always feel obligated to warn people of posting about workplace issues when their username may be their actual name. If you are on SE, a colleague may be as well.

    – Dpeif
    May 10 at 0:19











  • You might get some answers on pm.stackexchange.com

    – Dave Gremlin
    2 days ago

















26















I’ve had a recurring problem with people I work with leaving things until the last minute, then when there are problems, having no time to address them. Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”. I don’t really want to resort to complaining to higher management because that just makes things worse for the other person rather than fixing the problem.



Edit: I've had a number of questions asking about my relationship with the others, and this happens in several situations:



  • Actual subordinates - but this is relatively rare as a problem.

  • Same level coworkers, usually where we are in a team formed by request from higher up.

  • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.









share|improve this question
























  • What "problems" are you encountering after they deliver? Is it issues with their code or integration issues or ??? Maybe the problem isn't with them, it's with moving requirements, etc.?

    – JeffC
    May 9 at 21:20











  • “Deadlines for “drafts” or similar sometimes work but are often disregarded” — hey, I spotted your problem.

    – Paul D. Waite
    May 9 at 22:21






  • 5





    I always feel obligated to warn people of posting about workplace issues when their username may be their actual name. If you are on SE, a colleague may be as well.

    – Dpeif
    May 10 at 0:19











  • You might get some answers on pm.stackexchange.com

    – Dave Gremlin
    2 days ago













26












26








26


4






I’ve had a recurring problem with people I work with leaving things until the last minute, then when there are problems, having no time to address them. Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”. I don’t really want to resort to complaining to higher management because that just makes things worse for the other person rather than fixing the problem.



Edit: I've had a number of questions asking about my relationship with the others, and this happens in several situations:



  • Actual subordinates - but this is relatively rare as a problem.

  • Same level coworkers, usually where we are in a team formed by request from higher up.

  • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.









share|improve this question
















I’ve had a recurring problem with people I work with leaving things until the last minute, then when there are problems, having no time to address them. Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”. I don’t really want to resort to complaining to higher management because that just makes things worse for the other person rather than fixing the problem.



Edit: I've had a number of questions asking about my relationship with the others, and this happens in several situations:



  • Actual subordinates - but this is relatively rare as a problem.

  • Same level coworkers, usually where we are in a team formed by request from higher up.

  • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.






professionalism people-management task-management






share|improve this question















share|improve this question













share|improve this question




share|improve this question








edited May 10 at 17:46









Freiheit

676422




676422










asked May 9 at 14:51







anon



















  • What "problems" are you encountering after they deliver? Is it issues with their code or integration issues or ??? Maybe the problem isn't with them, it's with moving requirements, etc.?

    – JeffC
    May 9 at 21:20











  • “Deadlines for “drafts” or similar sometimes work but are often disregarded” — hey, I spotted your problem.

    – Paul D. Waite
    May 9 at 22:21






  • 5





    I always feel obligated to warn people of posting about workplace issues when their username may be their actual name. If you are on SE, a colleague may be as well.

    – Dpeif
    May 10 at 0:19











  • You might get some answers on pm.stackexchange.com

    – Dave Gremlin
    2 days ago

















  • What "problems" are you encountering after they deliver? Is it issues with their code or integration issues or ??? Maybe the problem isn't with them, it's with moving requirements, etc.?

    – JeffC
    May 9 at 21:20











  • “Deadlines for “drafts” or similar sometimes work but are often disregarded” — hey, I spotted your problem.

    – Paul D. Waite
    May 9 at 22:21






  • 5





    I always feel obligated to warn people of posting about workplace issues when their username may be their actual name. If you are on SE, a colleague may be as well.

    – Dpeif
    May 10 at 0:19











  • You might get some answers on pm.stackexchange.com

    – Dave Gremlin
    2 days ago
















What "problems" are you encountering after they deliver? Is it issues with their code or integration issues or ??? Maybe the problem isn't with them, it's with moving requirements, etc.?

– JeffC
May 9 at 21:20





What "problems" are you encountering after they deliver? Is it issues with their code or integration issues or ??? Maybe the problem isn't with them, it's with moving requirements, etc.?

– JeffC
May 9 at 21:20













“Deadlines for “drafts” or similar sometimes work but are often disregarded” — hey, I spotted your problem.

– Paul D. Waite
May 9 at 22:21





“Deadlines for “drafts” or similar sometimes work but are often disregarded” — hey, I spotted your problem.

– Paul D. Waite
May 9 at 22:21




5




5





I always feel obligated to warn people of posting about workplace issues when their username may be their actual name. If you are on SE, a colleague may be as well.

– Dpeif
May 10 at 0:19





I always feel obligated to warn people of posting about workplace issues when their username may be their actual name. If you are on SE, a colleague may be as well.

– Dpeif
May 10 at 0:19













You might get some answers on pm.stackexchange.com

– Dave Gremlin
2 days ago





You might get some answers on pm.stackexchange.com

– Dave Gremlin
2 days ago










9 Answers
9






active

oldest

votes


















29















I’ve had a recurring problem with people I work with leaving things until the last minute




and




Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.




This is a problem which has been going on for a while. From the OP it sounds like you've tried to address it by making the deadline earlier, which hasn't worked.




I don’t really want to resort to complaining to higher management




Good call. If they are your subordinates you're supposed to manage their deliverables, not your boss.



Have you tried any of the ideas below



Ask your Team for Guidance



It sounds like you've complained one on one to team members. Get your team together and explain how missing deadlines affects the team. For example,




Everyone had to work Saturday because X wasn't finished on time.




Then ask your team why it wasn't, and what needs to change to ensure it doesn't happen again. Don't blame individuals. Listen to what your people have to say. This should be a team effort.



Task Tracking Software



If you're currently not tracking all task and deliverables in a system with a defined workflow, start doing that. This will both ensure everyone knows what they are supposed to be doing, and gives you an easy way to see the status of each task. It may also show that one person has too many priority items on their plate.



Daily Stand-up Meetings



Have a meeting every morning once everyone has arrived. Each person should have 30 seconds to answer the following questions



1) What did you do yesterday



2) What are you going to do today



3) Is anything blocking you



If an issue will take longer than 30 seconds, then say "Who do you need to help you?" and ensure they talk post meeting.






share|improve this answer




















  • 5





    "Everyone has to work on Saturday, because X wasn't finished on time" may work in some countries, in many other countries that would be a total no-no, up to downright illegal.

    – Abigail
    May 9 at 17:21






  • 14





    @Abigail - The OP should replace that with the actual consequences of not finishing on time. I've had to work the weekend because someone else didn't get their work done on time so I used that example.

    – sevensevens
    May 9 at 17:25











  • Furthermore, some people don't mind working the weekends, if, for example they are paid hourly.... Or just have something a home life that they'd rather avoid for whatever reason.

    – Ted Delezene
    May 9 at 21:13











  • From my reading of the question, it's not that deadlines aren't being met... it's that they meet the deadline given the current requirements exactly on time. The problem comes when the work delivered needs adjustments for whatever reason and there's no time left to do that (because we're already at the deadline).

    – JeffC
    May 9 at 21:17






  • 1





    @JeffC - The OP explicitly said it was not working -> Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.

    – sevensevens
    May 10 at 2:26


















17














I once worked with a guy who would give me (and others) things to read/proofread/edit/etc. At first, I would do the chore immediately to get it off my desk. But the instant I or anyone else made a correction to the document, then we all got a revised copy of the document. It was impossible to get the chore off one's desk for more than an hour.



So we all learned to put the thing aside for a month or so, then do one edit. If it came back, we waited another month before we returned it. It cut the number of times we had to read through the same stupid document by a factor of 30.



So perhaps you're like this guy. If you have a recurring problem with last minute revisions, then perhaps your workers are dragging their feet on purpose, in order to reduce the number of iterations. In general, workers will do this. Their reward for doing something promptly is to be given more work.



My advice is that first you do some soul-searching. Are your workers deliberately handing things back at quitting time because they want to avoid the boomerang? If so, try not to be the boomerang and then set a reasonable number of intermediate deadlines.






share|improve this answer























  • The problem you describe is that you were allocated work by someone other than your boss, so it had no priority and could be ignored. You'd have been better to go to your boss and ask him to manage the problem. He could have told the guy to stop bothering you, or set a limit on the amount of time you spend reviewing, or billed the other department each time. He'd have fixed the problem rather than introducing a massive delay.

    – Robin Bennett
    May 10 at 8:45











  • @RobinBennett Not quite. This was academia. The guy was senior to me. Not exactly my boss but put in charge of this or that project. He could make the tiniest little chore into a year-long project that featured prominently on his annual Activity Report.

    – B. Goddard
    May 10 at 11:26











  • I was wondering the same thing - maybe the workers consider these "iterations" pointless (or at least not worth the effort) and submit late on purpose to avoid them. Maybe something for OP to ponder on.

    – xLeitix
    May 10 at 12:09


















8















Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”




There is no point having deadlines, the if they are not adhered to. It really does not matter what the deadline is for - if it's a deadline, it needs to be adhered to.



There can be couple of scenarios why is this happening:



  1. Once assigned a task and accepted an agreed-upon deadline, the assignees are judging the merit of the task and changing the completion time at-will.

  2. The estimation for the tasks are poor and the team is struggling to meet the deadlines

  3. The team / employees are not up to the mark.

As you have explained, it seems like it's been going on for a while - try talking to the team - either one on one or in a group meeting and explain how missing the deadlines affect the overall deliverable and quality. Also, listen to what they have to offer as a reason for missing the deadlines.




  • If it's point (1)



    • If you're the one supposed to enforce the work policies (and ethics) (i.e., in a managerial position), do it.


    • Otherwise, bring this problem to the notice of your superiors.



  • If it's point (2): Time to revise the work planning and estimation process.


  • If it's point (3): Performance issue.





share|improve this answer




















  • 2





    The thing is people DO judge the merit of deadlines. An arbitrary deadline imposed without input from the people doing the work and without any rationale beyond "what the boss/PM wants", will not be taken seriously by most knowledge-worker professionals. Life will be easier if the OP can instead gain the cooperation of his directs.

    – teego1967
    May 10 at 11:18


















5














Examine the cause for why they are postponing the tasks.



Oftentimes, changing goalposts and specifications end up with work needing to be done twice if it is started to early. The suggestion of "revisions" also suggests that possibility.






share|improve this answer


















  • 1





    Very important point. An organization where you do it once if you do it last-minute and 5 times if you do it well in advance quickly learns to do everything last-minute.

    – xLeitix
    May 10 at 12:09


















3














I think @sevensevens' are great suggestions, I would like to add that you need to change your process slightly. Your problem is that apparently the nature of the work of your team needs some kind of revision, but for some reason that is not part of the work that has to be done, so there is a false sense that it is done before being reviewed.



Basically, you need to change your definition of done. I would probably discuss it with the team as everyone had suggested and see how to better fit this revisions as part of the workflow.
This makes the revisions part of the work they have to do and not something "optional".



For example if you are writing documents, or creating whatever kind of element that could benefit from someone else's reviews, you could add a step to the end of the process where someone else has to "review it", be it, read the document, or if it some kind of presentation see it. Then has to input their opinion, things to correct, things they liked, whatever you and your team dim appropiate, and then you leave another day after that too implement those "changes".



In order for this to work, these reviews need to have some kind of paper trail, like if you had the tracking software suggested would be great, but with a simple email, copying you, listing the findings would be alright too. This will force a natural "earlier" deadline because now the work has to be reviewed by someone else. And cause peer pressure, because people won't want to mess with their coworkers' deadlines either.



However if this is some kind of creative effort, it feels odd that you would wait till the end to make these reviews. It also feels odd that they are not part of the process. It would be better to integrate several checkpoints to the process to review key things. Like close to the begining you could check what approach is going to be taken, later on how it is going and what is needed. Daily meetings, like someone else suggested, are great to help people with every day issues for example.



An important thing with these changes to the workflow though, is not to make it endless, there has to be a point where it ends. Set specific checkpoints and actions to be taken and go through with it. Even if not every tiny issue is addressed, you will be better off than right now where you have no time to fix even major issues.



Also later on if there were things in the document or whatever is that your team is producing that were not addressed, you can hold a meeting with the 2 people involved and discuss why no one noticed those issues.



Finally, is it worth it? I mean, it seems this has been happening for a while, maybe it is not so important that those reviews are not implemented? If it is important, discuss it with your team and tell them the immediate and long term consequences of what happened. For example the team has a poor image in the organization because they always deliver late or unpolished work; wich could have a bad impact in their careers and opportunities for advancement.






share|improve this answer








New contributor



Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.


























    1














    If you are in charge of assigning the projects and setting the deadlines then include revisions in the scope of the project. This ensures that if the revisions are not completed then the deadline for the project has not been met and disciplinary action can be taken. Of course, this only applies to cases where the employees in question are your subordinates and you assigned them the project. This also assumes that you are allotting a reasonable amount of time for you project ( including revisions ) to be completed.






    share|improve this answer






























      1















      • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.



      Start there.



      Your direct boss is the person best placed to help you out and, by the sounds of it, they have direct exposure to something important that you lead.



      If deadlines are a big problem and you feel that this is detracting from the work of the team as a whole then you should discuss it with your boss. Raise the issue, politely, and ask how they feel about . You want to get them on board with your idea so keep your options open and if possible try to get them to suggest a way forwards (most will be naturally inclined towards liking their own idea).



      If they get on board then:



      a) this gives you a vehicle to improve colleague performance



      b) your manager might improve their own performance



      Of course they might dismiss the idea that deadlines are problematic. This gives you an answer really fast: you are stuck with the problem.






      share|improve this answer






























        0














        If you are not a manager, then you should raise the issue at least on generic terms to management. They should start looking closer to the situation without you having to point fingers around.



        If you are a manager, try creating clear lines of responsibility. This means making clear who is responsible for what, and makes it easier to track with employee' performances. Make sure that tasks are not concluded just because the responsible person said so, and don't rely on reviewers to point out other people's poor deliveries.



        If possible, hire someone new, so that at least for a while you should know that the workload can be dealt within the available time by the team.



        Either way: Start assigning more tasks to people who meet deadlines, maybe even request that they work extra hours (make sure are paid to do so, do prefer the extra money instead on the usual work hour, and are aware they're being paid for it).



        Make clear to people not meeting deadlines that they're not allowed to work extra hours. Assign less tasks to them, and with time they'll start meeting their deadlines. If someone is still not meeting deadlines, then further reduce their workload. Anyone with common sense would know this is a foreshadowing to being fired, and should make an effort to make up for it.



        Don't think of this as "getting rid of rotten apples", this is not the point. At first this is just adjusting workload to everyone's capacity. Just try to give some reward to who is getting overloaded in the process, and people should go for this reward as well. If most people seem interested in having more free time at the office, then you should consider replacing someone.






        share|improve this answer






























          0














          • Hire a project manager per ~10 people in a project.

          • His main job is to map "customer deadlines" to internal deadlines

          • Also have some "Product owner"-like function which actually defines the acceptance criteria of the internal work.





          share|improve this answer























            Your Answer








            StackExchange.ready(function()
            var channelOptions =
            tags: "".split(" "),
            id: "423"
            ;
            initTagRenderer("".split(" "), "".split(" "), channelOptions);

            StackExchange.using("externalEditor", function()
            // Have to fire editor after snippets, if snippets enabled
            if (StackExchange.settings.snippets.snippetsEnabled)
            StackExchange.using("snippets", function()
            createEditor();
            );

            else
            createEditor();

            );

            function createEditor()
            StackExchange.prepareEditor(
            heartbeatType: 'answer',
            autoActivateHeartbeat: false,
            convertImagesToLinks: false,
            noModals: true,
            showLowRepImageUploadWarning: true,
            reputationToPostImages: null,
            bindNavPrevention: true,
            postfix: "",
            imageUploader:
            brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
            contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
            allowUrls: true
            ,
            noCode: true, onDemand: false,
            discardSelector: ".discard-answer"
            ,immediatelyShowMarkdownHelp:true
            );



            );













            draft saved

            draft discarded


















            StackExchange.ready(
            function ()
            StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f136280%2fhow-can-i-avoid-subordinates-and-coworkers-putting-off-tasks-until-the-last-minu%23new-answer', 'question_page');

            );

            Post as a guest















            Required, but never shown




















            StackExchange.ready(function ()
            $("#show-editor-button input, #show-editor-button button").click(function ()
            var showEditor = function()
            $("#show-editor-button").hide();
            $("#post-form").removeClass("dno");
            StackExchange.editor.finallyInit();
            ;

            var useFancy = $(this).data('confirm-use-fancy');
            if(useFancy == 'True')
            var popupTitle = $(this).data('confirm-fancy-title');
            var popupBody = $(this).data('confirm-fancy-body');
            var popupAccept = $(this).data('confirm-fancy-accept-button');

            $(this).loadPopup(
            url: '/post/self-answer-popup',
            loaded: function(popup)
            var pTitle = $(popup).find('h2');
            var pBody = $(popup).find('.popup-body');
            var pSubmit = $(popup).find('.popup-submit');

            pTitle.text(popupTitle);
            pBody.html(popupBody);
            pSubmit.val(popupAccept).click(showEditor);

            )
            else
            var confirmText = $(this).data('confirm-text');
            if (confirmText ? confirm(confirmText) : true)
            showEditor();


            );
            );






            9 Answers
            9






            active

            oldest

            votes








            9 Answers
            9






            active

            oldest

            votes









            active

            oldest

            votes






            active

            oldest

            votes









            29















            I’ve had a recurring problem with people I work with leaving things until the last minute




            and




            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.




            This is a problem which has been going on for a while. From the OP it sounds like you've tried to address it by making the deadline earlier, which hasn't worked.




            I don’t really want to resort to complaining to higher management




            Good call. If they are your subordinates you're supposed to manage their deliverables, not your boss.



            Have you tried any of the ideas below



            Ask your Team for Guidance



            It sounds like you've complained one on one to team members. Get your team together and explain how missing deadlines affects the team. For example,




            Everyone had to work Saturday because X wasn't finished on time.




            Then ask your team why it wasn't, and what needs to change to ensure it doesn't happen again. Don't blame individuals. Listen to what your people have to say. This should be a team effort.



            Task Tracking Software



            If you're currently not tracking all task and deliverables in a system with a defined workflow, start doing that. This will both ensure everyone knows what they are supposed to be doing, and gives you an easy way to see the status of each task. It may also show that one person has too many priority items on their plate.



            Daily Stand-up Meetings



            Have a meeting every morning once everyone has arrived. Each person should have 30 seconds to answer the following questions



            1) What did you do yesterday



            2) What are you going to do today



            3) Is anything blocking you



            If an issue will take longer than 30 seconds, then say "Who do you need to help you?" and ensure they talk post meeting.






            share|improve this answer




















            • 5





              "Everyone has to work on Saturday, because X wasn't finished on time" may work in some countries, in many other countries that would be a total no-no, up to downright illegal.

              – Abigail
              May 9 at 17:21






            • 14





              @Abigail - The OP should replace that with the actual consequences of not finishing on time. I've had to work the weekend because someone else didn't get their work done on time so I used that example.

              – sevensevens
              May 9 at 17:25











            • Furthermore, some people don't mind working the weekends, if, for example they are paid hourly.... Or just have something a home life that they'd rather avoid for whatever reason.

              – Ted Delezene
              May 9 at 21:13











            • From my reading of the question, it's not that deadlines aren't being met... it's that they meet the deadline given the current requirements exactly on time. The problem comes when the work delivered needs adjustments for whatever reason and there's no time left to do that (because we're already at the deadline).

              – JeffC
              May 9 at 21:17






            • 1





              @JeffC - The OP explicitly said it was not working -> Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.

              – sevensevens
              May 10 at 2:26















            29















            I’ve had a recurring problem with people I work with leaving things until the last minute




            and




            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.




            This is a problem which has been going on for a while. From the OP it sounds like you've tried to address it by making the deadline earlier, which hasn't worked.




            I don’t really want to resort to complaining to higher management




            Good call. If they are your subordinates you're supposed to manage their deliverables, not your boss.



            Have you tried any of the ideas below



            Ask your Team for Guidance



            It sounds like you've complained one on one to team members. Get your team together and explain how missing deadlines affects the team. For example,




            Everyone had to work Saturday because X wasn't finished on time.




            Then ask your team why it wasn't, and what needs to change to ensure it doesn't happen again. Don't blame individuals. Listen to what your people have to say. This should be a team effort.



            Task Tracking Software



            If you're currently not tracking all task and deliverables in a system with a defined workflow, start doing that. This will both ensure everyone knows what they are supposed to be doing, and gives you an easy way to see the status of each task. It may also show that one person has too many priority items on their plate.



            Daily Stand-up Meetings



            Have a meeting every morning once everyone has arrived. Each person should have 30 seconds to answer the following questions



            1) What did you do yesterday



            2) What are you going to do today



            3) Is anything blocking you



            If an issue will take longer than 30 seconds, then say "Who do you need to help you?" and ensure they talk post meeting.






            share|improve this answer




















            • 5





              "Everyone has to work on Saturday, because X wasn't finished on time" may work in some countries, in many other countries that would be a total no-no, up to downright illegal.

              – Abigail
              May 9 at 17:21






            • 14





              @Abigail - The OP should replace that with the actual consequences of not finishing on time. I've had to work the weekend because someone else didn't get their work done on time so I used that example.

              – sevensevens
              May 9 at 17:25











            • Furthermore, some people don't mind working the weekends, if, for example they are paid hourly.... Or just have something a home life that they'd rather avoid for whatever reason.

              – Ted Delezene
              May 9 at 21:13











            • From my reading of the question, it's not that deadlines aren't being met... it's that they meet the deadline given the current requirements exactly on time. The problem comes when the work delivered needs adjustments for whatever reason and there's no time left to do that (because we're already at the deadline).

              – JeffC
              May 9 at 21:17






            • 1





              @JeffC - The OP explicitly said it was not working -> Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.

              – sevensevens
              May 10 at 2:26













            29












            29








            29








            I’ve had a recurring problem with people I work with leaving things until the last minute




            and




            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.




            This is a problem which has been going on for a while. From the OP it sounds like you've tried to address it by making the deadline earlier, which hasn't worked.




            I don’t really want to resort to complaining to higher management




            Good call. If they are your subordinates you're supposed to manage their deliverables, not your boss.



            Have you tried any of the ideas below



            Ask your Team for Guidance



            It sounds like you've complained one on one to team members. Get your team together and explain how missing deadlines affects the team. For example,




            Everyone had to work Saturday because X wasn't finished on time.




            Then ask your team why it wasn't, and what needs to change to ensure it doesn't happen again. Don't blame individuals. Listen to what your people have to say. This should be a team effort.



            Task Tracking Software



            If you're currently not tracking all task and deliverables in a system with a defined workflow, start doing that. This will both ensure everyone knows what they are supposed to be doing, and gives you an easy way to see the status of each task. It may also show that one person has too many priority items on their plate.



            Daily Stand-up Meetings



            Have a meeting every morning once everyone has arrived. Each person should have 30 seconds to answer the following questions



            1) What did you do yesterday



            2) What are you going to do today



            3) Is anything blocking you



            If an issue will take longer than 30 seconds, then say "Who do you need to help you?" and ensure they talk post meeting.






            share|improve this answer
















            I’ve had a recurring problem with people I work with leaving things until the last minute




            and




            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.




            This is a problem which has been going on for a while. From the OP it sounds like you've tried to address it by making the deadline earlier, which hasn't worked.




            I don’t really want to resort to complaining to higher management




            Good call. If they are your subordinates you're supposed to manage their deliverables, not your boss.



            Have you tried any of the ideas below



            Ask your Team for Guidance



            It sounds like you've complained one on one to team members. Get your team together and explain how missing deadlines affects the team. For example,




            Everyone had to work Saturday because X wasn't finished on time.




            Then ask your team why it wasn't, and what needs to change to ensure it doesn't happen again. Don't blame individuals. Listen to what your people have to say. This should be a team effort.



            Task Tracking Software



            If you're currently not tracking all task and deliverables in a system with a defined workflow, start doing that. This will both ensure everyone knows what they are supposed to be doing, and gives you an easy way to see the status of each task. It may also show that one person has too many priority items on their plate.



            Daily Stand-up Meetings



            Have a meeting every morning once everyone has arrived. Each person should have 30 seconds to answer the following questions



            1) What did you do yesterday



            2) What are you going to do today



            3) Is anything blocking you



            If an issue will take longer than 30 seconds, then say "Who do you need to help you?" and ensure they talk post meeting.







            share|improve this answer














            share|improve this answer



            share|improve this answer








            edited 2 days ago

























            answered May 9 at 16:21









            sevensevenssevensevens

            13.8k43047




            13.8k43047







            • 5





              "Everyone has to work on Saturday, because X wasn't finished on time" may work in some countries, in many other countries that would be a total no-no, up to downright illegal.

              – Abigail
              May 9 at 17:21






            • 14





              @Abigail - The OP should replace that with the actual consequences of not finishing on time. I've had to work the weekend because someone else didn't get their work done on time so I used that example.

              – sevensevens
              May 9 at 17:25











            • Furthermore, some people don't mind working the weekends, if, for example they are paid hourly.... Or just have something a home life that they'd rather avoid for whatever reason.

              – Ted Delezene
              May 9 at 21:13











            • From my reading of the question, it's not that deadlines aren't being met... it's that they meet the deadline given the current requirements exactly on time. The problem comes when the work delivered needs adjustments for whatever reason and there's no time left to do that (because we're already at the deadline).

              – JeffC
              May 9 at 21:17






            • 1





              @JeffC - The OP explicitly said it was not working -> Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.

              – sevensevens
              May 10 at 2:26












            • 5





              "Everyone has to work on Saturday, because X wasn't finished on time" may work in some countries, in many other countries that would be a total no-no, up to downright illegal.

              – Abigail
              May 9 at 17:21






            • 14





              @Abigail - The OP should replace that with the actual consequences of not finishing on time. I've had to work the weekend because someone else didn't get their work done on time so I used that example.

              – sevensevens
              May 9 at 17:25











            • Furthermore, some people don't mind working the weekends, if, for example they are paid hourly.... Or just have something a home life that they'd rather avoid for whatever reason.

              – Ted Delezene
              May 9 at 21:13











            • From my reading of the question, it's not that deadlines aren't being met... it's that they meet the deadline given the current requirements exactly on time. The problem comes when the work delivered needs adjustments for whatever reason and there's no time left to do that (because we're already at the deadline).

              – JeffC
              May 9 at 21:17






            • 1





              @JeffC - The OP explicitly said it was not working -> Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.

              – sevensevens
              May 10 at 2:26







            5




            5





            "Everyone has to work on Saturday, because X wasn't finished on time" may work in some countries, in many other countries that would be a total no-no, up to downright illegal.

            – Abigail
            May 9 at 17:21





            "Everyone has to work on Saturday, because X wasn't finished on time" may work in some countries, in many other countries that would be a total no-no, up to downright illegal.

            – Abigail
            May 9 at 17:21




            14




            14





            @Abigail - The OP should replace that with the actual consequences of not finishing on time. I've had to work the weekend because someone else didn't get their work done on time so I used that example.

            – sevensevens
            May 9 at 17:25





            @Abigail - The OP should replace that with the actual consequences of not finishing on time. I've had to work the weekend because someone else didn't get their work done on time so I used that example.

            – sevensevens
            May 9 at 17:25













            Furthermore, some people don't mind working the weekends, if, for example they are paid hourly.... Or just have something a home life that they'd rather avoid for whatever reason.

            – Ted Delezene
            May 9 at 21:13





            Furthermore, some people don't mind working the weekends, if, for example they are paid hourly.... Or just have something a home life that they'd rather avoid for whatever reason.

            – Ted Delezene
            May 9 at 21:13













            From my reading of the question, it's not that deadlines aren't being met... it's that they meet the deadline given the current requirements exactly on time. The problem comes when the work delivered needs adjustments for whatever reason and there's no time left to do that (because we're already at the deadline).

            – JeffC
            May 9 at 21:17





            From my reading of the question, it's not that deadlines aren't being met... it's that they meet the deadline given the current requirements exactly on time. The problem comes when the work delivered needs adjustments for whatever reason and there's no time left to do that (because we're already at the deadline).

            – JeffC
            May 9 at 21:17




            1




            1





            @JeffC - The OP explicitly said it was not working -> Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.

            – sevensevens
            May 10 at 2:26





            @JeffC - The OP explicitly said it was not working -> Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”.

            – sevensevens
            May 10 at 2:26













            17














            I once worked with a guy who would give me (and others) things to read/proofread/edit/etc. At first, I would do the chore immediately to get it off my desk. But the instant I or anyone else made a correction to the document, then we all got a revised copy of the document. It was impossible to get the chore off one's desk for more than an hour.



            So we all learned to put the thing aside for a month or so, then do one edit. If it came back, we waited another month before we returned it. It cut the number of times we had to read through the same stupid document by a factor of 30.



            So perhaps you're like this guy. If you have a recurring problem with last minute revisions, then perhaps your workers are dragging their feet on purpose, in order to reduce the number of iterations. In general, workers will do this. Their reward for doing something promptly is to be given more work.



            My advice is that first you do some soul-searching. Are your workers deliberately handing things back at quitting time because they want to avoid the boomerang? If so, try not to be the boomerang and then set a reasonable number of intermediate deadlines.






            share|improve this answer























            • The problem you describe is that you were allocated work by someone other than your boss, so it had no priority and could be ignored. You'd have been better to go to your boss and ask him to manage the problem. He could have told the guy to stop bothering you, or set a limit on the amount of time you spend reviewing, or billed the other department each time. He'd have fixed the problem rather than introducing a massive delay.

              – Robin Bennett
              May 10 at 8:45











            • @RobinBennett Not quite. This was academia. The guy was senior to me. Not exactly my boss but put in charge of this or that project. He could make the tiniest little chore into a year-long project that featured prominently on his annual Activity Report.

              – B. Goddard
              May 10 at 11:26











            • I was wondering the same thing - maybe the workers consider these "iterations" pointless (or at least not worth the effort) and submit late on purpose to avoid them. Maybe something for OP to ponder on.

              – xLeitix
              May 10 at 12:09















            17














            I once worked with a guy who would give me (and others) things to read/proofread/edit/etc. At first, I would do the chore immediately to get it off my desk. But the instant I or anyone else made a correction to the document, then we all got a revised copy of the document. It was impossible to get the chore off one's desk for more than an hour.



            So we all learned to put the thing aside for a month or so, then do one edit. If it came back, we waited another month before we returned it. It cut the number of times we had to read through the same stupid document by a factor of 30.



            So perhaps you're like this guy. If you have a recurring problem with last minute revisions, then perhaps your workers are dragging their feet on purpose, in order to reduce the number of iterations. In general, workers will do this. Their reward for doing something promptly is to be given more work.



            My advice is that first you do some soul-searching. Are your workers deliberately handing things back at quitting time because they want to avoid the boomerang? If so, try not to be the boomerang and then set a reasonable number of intermediate deadlines.






            share|improve this answer























            • The problem you describe is that you were allocated work by someone other than your boss, so it had no priority and could be ignored. You'd have been better to go to your boss and ask him to manage the problem. He could have told the guy to stop bothering you, or set a limit on the amount of time you spend reviewing, or billed the other department each time. He'd have fixed the problem rather than introducing a massive delay.

              – Robin Bennett
              May 10 at 8:45











            • @RobinBennett Not quite. This was academia. The guy was senior to me. Not exactly my boss but put in charge of this or that project. He could make the tiniest little chore into a year-long project that featured prominently on his annual Activity Report.

              – B. Goddard
              May 10 at 11:26











            • I was wondering the same thing - maybe the workers consider these "iterations" pointless (or at least not worth the effort) and submit late on purpose to avoid them. Maybe something for OP to ponder on.

              – xLeitix
              May 10 at 12:09













            17












            17








            17







            I once worked with a guy who would give me (and others) things to read/proofread/edit/etc. At first, I would do the chore immediately to get it off my desk. But the instant I or anyone else made a correction to the document, then we all got a revised copy of the document. It was impossible to get the chore off one's desk for more than an hour.



            So we all learned to put the thing aside for a month or so, then do one edit. If it came back, we waited another month before we returned it. It cut the number of times we had to read through the same stupid document by a factor of 30.



            So perhaps you're like this guy. If you have a recurring problem with last minute revisions, then perhaps your workers are dragging their feet on purpose, in order to reduce the number of iterations. In general, workers will do this. Their reward for doing something promptly is to be given more work.



            My advice is that first you do some soul-searching. Are your workers deliberately handing things back at quitting time because they want to avoid the boomerang? If so, try not to be the boomerang and then set a reasonable number of intermediate deadlines.






            share|improve this answer













            I once worked with a guy who would give me (and others) things to read/proofread/edit/etc. At first, I would do the chore immediately to get it off my desk. But the instant I or anyone else made a correction to the document, then we all got a revised copy of the document. It was impossible to get the chore off one's desk for more than an hour.



            So we all learned to put the thing aside for a month or so, then do one edit. If it came back, we waited another month before we returned it. It cut the number of times we had to read through the same stupid document by a factor of 30.



            So perhaps you're like this guy. If you have a recurring problem with last minute revisions, then perhaps your workers are dragging their feet on purpose, in order to reduce the number of iterations. In general, workers will do this. Their reward for doing something promptly is to be given more work.



            My advice is that first you do some soul-searching. Are your workers deliberately handing things back at quitting time because they want to avoid the boomerang? If so, try not to be the boomerang and then set a reasonable number of intermediate deadlines.







            share|improve this answer












            share|improve this answer



            share|improve this answer










            answered May 9 at 20:37









            B. GoddardB. Goddard

            8115




            8115












            • The problem you describe is that you were allocated work by someone other than your boss, so it had no priority and could be ignored. You'd have been better to go to your boss and ask him to manage the problem. He could have told the guy to stop bothering you, or set a limit on the amount of time you spend reviewing, or billed the other department each time. He'd have fixed the problem rather than introducing a massive delay.

              – Robin Bennett
              May 10 at 8:45











            • @RobinBennett Not quite. This was academia. The guy was senior to me. Not exactly my boss but put in charge of this or that project. He could make the tiniest little chore into a year-long project that featured prominently on his annual Activity Report.

              – B. Goddard
              May 10 at 11:26











            • I was wondering the same thing - maybe the workers consider these "iterations" pointless (or at least not worth the effort) and submit late on purpose to avoid them. Maybe something for OP to ponder on.

              – xLeitix
              May 10 at 12:09

















            • The problem you describe is that you were allocated work by someone other than your boss, so it had no priority and could be ignored. You'd have been better to go to your boss and ask him to manage the problem. He could have told the guy to stop bothering you, or set a limit on the amount of time you spend reviewing, or billed the other department each time. He'd have fixed the problem rather than introducing a massive delay.

              – Robin Bennett
              May 10 at 8:45











            • @RobinBennett Not quite. This was academia. The guy was senior to me. Not exactly my boss but put in charge of this or that project. He could make the tiniest little chore into a year-long project that featured prominently on his annual Activity Report.

              – B. Goddard
              May 10 at 11:26











            • I was wondering the same thing - maybe the workers consider these "iterations" pointless (or at least not worth the effort) and submit late on purpose to avoid them. Maybe something for OP to ponder on.

              – xLeitix
              May 10 at 12:09
















            The problem you describe is that you were allocated work by someone other than your boss, so it had no priority and could be ignored. You'd have been better to go to your boss and ask him to manage the problem. He could have told the guy to stop bothering you, or set a limit on the amount of time you spend reviewing, or billed the other department each time. He'd have fixed the problem rather than introducing a massive delay.

            – Robin Bennett
            May 10 at 8:45





            The problem you describe is that you were allocated work by someone other than your boss, so it had no priority and could be ignored. You'd have been better to go to your boss and ask him to manage the problem. He could have told the guy to stop bothering you, or set a limit on the amount of time you spend reviewing, or billed the other department each time. He'd have fixed the problem rather than introducing a massive delay.

            – Robin Bennett
            May 10 at 8:45













            @RobinBennett Not quite. This was academia. The guy was senior to me. Not exactly my boss but put in charge of this or that project. He could make the tiniest little chore into a year-long project that featured prominently on his annual Activity Report.

            – B. Goddard
            May 10 at 11:26





            @RobinBennett Not quite. This was academia. The guy was senior to me. Not exactly my boss but put in charge of this or that project. He could make the tiniest little chore into a year-long project that featured prominently on his annual Activity Report.

            – B. Goddard
            May 10 at 11:26













            I was wondering the same thing - maybe the workers consider these "iterations" pointless (or at least not worth the effort) and submit late on purpose to avoid them. Maybe something for OP to ponder on.

            – xLeitix
            May 10 at 12:09





            I was wondering the same thing - maybe the workers consider these "iterations" pointless (or at least not worth the effort) and submit late on purpose to avoid them. Maybe something for OP to ponder on.

            – xLeitix
            May 10 at 12:09











            8















            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”




            There is no point having deadlines, the if they are not adhered to. It really does not matter what the deadline is for - if it's a deadline, it needs to be adhered to.



            There can be couple of scenarios why is this happening:



            1. Once assigned a task and accepted an agreed-upon deadline, the assignees are judging the merit of the task and changing the completion time at-will.

            2. The estimation for the tasks are poor and the team is struggling to meet the deadlines

            3. The team / employees are not up to the mark.

            As you have explained, it seems like it's been going on for a while - try talking to the team - either one on one or in a group meeting and explain how missing the deadlines affect the overall deliverable and quality. Also, listen to what they have to offer as a reason for missing the deadlines.




            • If it's point (1)



              • If you're the one supposed to enforce the work policies (and ethics) (i.e., in a managerial position), do it.


              • Otherwise, bring this problem to the notice of your superiors.



            • If it's point (2): Time to revise the work planning and estimation process.


            • If it's point (3): Performance issue.





            share|improve this answer




















            • 2





              The thing is people DO judge the merit of deadlines. An arbitrary deadline imposed without input from the people doing the work and without any rationale beyond "what the boss/PM wants", will not be taken seriously by most knowledge-worker professionals. Life will be easier if the OP can instead gain the cooperation of his directs.

              – teego1967
              May 10 at 11:18















            8















            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”




            There is no point having deadlines, the if they are not adhered to. It really does not matter what the deadline is for - if it's a deadline, it needs to be adhered to.



            There can be couple of scenarios why is this happening:



            1. Once assigned a task and accepted an agreed-upon deadline, the assignees are judging the merit of the task and changing the completion time at-will.

            2. The estimation for the tasks are poor and the team is struggling to meet the deadlines

            3. The team / employees are not up to the mark.

            As you have explained, it seems like it's been going on for a while - try talking to the team - either one on one or in a group meeting and explain how missing the deadlines affect the overall deliverable and quality. Also, listen to what they have to offer as a reason for missing the deadlines.




            • If it's point (1)



              • If you're the one supposed to enforce the work policies (and ethics) (i.e., in a managerial position), do it.


              • Otherwise, bring this problem to the notice of your superiors.



            • If it's point (2): Time to revise the work planning and estimation process.


            • If it's point (3): Performance issue.





            share|improve this answer




















            • 2





              The thing is people DO judge the merit of deadlines. An arbitrary deadline imposed without input from the people doing the work and without any rationale beyond "what the boss/PM wants", will not be taken seriously by most knowledge-worker professionals. Life will be easier if the OP can instead gain the cooperation of his directs.

              – teego1967
              May 10 at 11:18













            8












            8








            8








            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”




            There is no point having deadlines, the if they are not adhered to. It really does not matter what the deadline is for - if it's a deadline, it needs to be adhered to.



            There can be couple of scenarios why is this happening:



            1. Once assigned a task and accepted an agreed-upon deadline, the assignees are judging the merit of the task and changing the completion time at-will.

            2. The estimation for the tasks are poor and the team is struggling to meet the deadlines

            3. The team / employees are not up to the mark.

            As you have explained, it seems like it's been going on for a while - try talking to the team - either one on one or in a group meeting and explain how missing the deadlines affect the overall deliverable and quality. Also, listen to what they have to offer as a reason for missing the deadlines.




            • If it's point (1)



              • If you're the one supposed to enforce the work policies (and ethics) (i.e., in a managerial position), do it.


              • Otherwise, bring this problem to the notice of your superiors.



            • If it's point (2): Time to revise the work planning and estimation process.


            • If it's point (3): Performance issue.





            share|improve this answer
















            Deadlines for “drafts” or similar sometimes work but are often disregarded because they’re “not that important”




            There is no point having deadlines, the if they are not adhered to. It really does not matter what the deadline is for - if it's a deadline, it needs to be adhered to.



            There can be couple of scenarios why is this happening:



            1. Once assigned a task and accepted an agreed-upon deadline, the assignees are judging the merit of the task and changing the completion time at-will.

            2. The estimation for the tasks are poor and the team is struggling to meet the deadlines

            3. The team / employees are not up to the mark.

            As you have explained, it seems like it's been going on for a while - try talking to the team - either one on one or in a group meeting and explain how missing the deadlines affect the overall deliverable and quality. Also, listen to what they have to offer as a reason for missing the deadlines.




            • If it's point (1)



              • If you're the one supposed to enforce the work policies (and ethics) (i.e., in a managerial position), do it.


              • Otherwise, bring this problem to the notice of your superiors.



            • If it's point (2): Time to revise the work planning and estimation process.


            • If it's point (3): Performance issue.






            share|improve this answer














            share|improve this answer



            share|improve this answer








            edited May 9 at 15:24

























            answered May 9 at 14:55









            Sourav GhoshSourav Ghosh

            15.1k147392




            15.1k147392







            • 2





              The thing is people DO judge the merit of deadlines. An arbitrary deadline imposed without input from the people doing the work and without any rationale beyond "what the boss/PM wants", will not be taken seriously by most knowledge-worker professionals. Life will be easier if the OP can instead gain the cooperation of his directs.

              – teego1967
              May 10 at 11:18












            • 2





              The thing is people DO judge the merit of deadlines. An arbitrary deadline imposed without input from the people doing the work and without any rationale beyond "what the boss/PM wants", will not be taken seriously by most knowledge-worker professionals. Life will be easier if the OP can instead gain the cooperation of his directs.

              – teego1967
              May 10 at 11:18







            2




            2





            The thing is people DO judge the merit of deadlines. An arbitrary deadline imposed without input from the people doing the work and without any rationale beyond "what the boss/PM wants", will not be taken seriously by most knowledge-worker professionals. Life will be easier if the OP can instead gain the cooperation of his directs.

            – teego1967
            May 10 at 11:18





            The thing is people DO judge the merit of deadlines. An arbitrary deadline imposed without input from the people doing the work and without any rationale beyond "what the boss/PM wants", will not be taken seriously by most knowledge-worker professionals. Life will be easier if the OP can instead gain the cooperation of his directs.

            – teego1967
            May 10 at 11:18











            5














            Examine the cause for why they are postponing the tasks.



            Oftentimes, changing goalposts and specifications end up with work needing to be done twice if it is started to early. The suggestion of "revisions" also suggests that possibility.






            share|improve this answer


















            • 1





              Very important point. An organization where you do it once if you do it last-minute and 5 times if you do it well in advance quickly learns to do everything last-minute.

              – xLeitix
              May 10 at 12:09















            5














            Examine the cause for why they are postponing the tasks.



            Oftentimes, changing goalposts and specifications end up with work needing to be done twice if it is started to early. The suggestion of "revisions" also suggests that possibility.






            share|improve this answer


















            • 1





              Very important point. An organization where you do it once if you do it last-minute and 5 times if you do it well in advance quickly learns to do everything last-minute.

              – xLeitix
              May 10 at 12:09













            5












            5








            5







            Examine the cause for why they are postponing the tasks.



            Oftentimes, changing goalposts and specifications end up with work needing to be done twice if it is started to early. The suggestion of "revisions" also suggests that possibility.






            share|improve this answer













            Examine the cause for why they are postponing the tasks.



            Oftentimes, changing goalposts and specifications end up with work needing to be done twice if it is started to early. The suggestion of "revisions" also suggests that possibility.







            share|improve this answer












            share|improve this answer



            share|improve this answer










            answered May 10 at 9:13









            rackandbonemanrackandboneman

            62737




            62737







            • 1





              Very important point. An organization where you do it once if you do it last-minute and 5 times if you do it well in advance quickly learns to do everything last-minute.

              – xLeitix
              May 10 at 12:09












            • 1





              Very important point. An organization where you do it once if you do it last-minute and 5 times if you do it well in advance quickly learns to do everything last-minute.

              – xLeitix
              May 10 at 12:09







            1




            1





            Very important point. An organization where you do it once if you do it last-minute and 5 times if you do it well in advance quickly learns to do everything last-minute.

            – xLeitix
            May 10 at 12:09





            Very important point. An organization where you do it once if you do it last-minute and 5 times if you do it well in advance quickly learns to do everything last-minute.

            – xLeitix
            May 10 at 12:09











            3














            I think @sevensevens' are great suggestions, I would like to add that you need to change your process slightly. Your problem is that apparently the nature of the work of your team needs some kind of revision, but for some reason that is not part of the work that has to be done, so there is a false sense that it is done before being reviewed.



            Basically, you need to change your definition of done. I would probably discuss it with the team as everyone had suggested and see how to better fit this revisions as part of the workflow.
            This makes the revisions part of the work they have to do and not something "optional".



            For example if you are writing documents, or creating whatever kind of element that could benefit from someone else's reviews, you could add a step to the end of the process where someone else has to "review it", be it, read the document, or if it some kind of presentation see it. Then has to input their opinion, things to correct, things they liked, whatever you and your team dim appropiate, and then you leave another day after that too implement those "changes".



            In order for this to work, these reviews need to have some kind of paper trail, like if you had the tracking software suggested would be great, but with a simple email, copying you, listing the findings would be alright too. This will force a natural "earlier" deadline because now the work has to be reviewed by someone else. And cause peer pressure, because people won't want to mess with their coworkers' deadlines either.



            However if this is some kind of creative effort, it feels odd that you would wait till the end to make these reviews. It also feels odd that they are not part of the process. It would be better to integrate several checkpoints to the process to review key things. Like close to the begining you could check what approach is going to be taken, later on how it is going and what is needed. Daily meetings, like someone else suggested, are great to help people with every day issues for example.



            An important thing with these changes to the workflow though, is not to make it endless, there has to be a point where it ends. Set specific checkpoints and actions to be taken and go through with it. Even if not every tiny issue is addressed, you will be better off than right now where you have no time to fix even major issues.



            Also later on if there were things in the document or whatever is that your team is producing that were not addressed, you can hold a meeting with the 2 people involved and discuss why no one noticed those issues.



            Finally, is it worth it? I mean, it seems this has been happening for a while, maybe it is not so important that those reviews are not implemented? If it is important, discuss it with your team and tell them the immediate and long term consequences of what happened. For example the team has a poor image in the organization because they always deliver late or unpolished work; wich could have a bad impact in their careers and opportunities for advancement.






            share|improve this answer








            New contributor



            Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
            Check out our Code of Conduct.























              3














              I think @sevensevens' are great suggestions, I would like to add that you need to change your process slightly. Your problem is that apparently the nature of the work of your team needs some kind of revision, but for some reason that is not part of the work that has to be done, so there is a false sense that it is done before being reviewed.



              Basically, you need to change your definition of done. I would probably discuss it with the team as everyone had suggested and see how to better fit this revisions as part of the workflow.
              This makes the revisions part of the work they have to do and not something "optional".



              For example if you are writing documents, or creating whatever kind of element that could benefit from someone else's reviews, you could add a step to the end of the process where someone else has to "review it", be it, read the document, or if it some kind of presentation see it. Then has to input their opinion, things to correct, things they liked, whatever you and your team dim appropiate, and then you leave another day after that too implement those "changes".



              In order for this to work, these reviews need to have some kind of paper trail, like if you had the tracking software suggested would be great, but with a simple email, copying you, listing the findings would be alright too. This will force a natural "earlier" deadline because now the work has to be reviewed by someone else. And cause peer pressure, because people won't want to mess with their coworkers' deadlines either.



              However if this is some kind of creative effort, it feels odd that you would wait till the end to make these reviews. It also feels odd that they are not part of the process. It would be better to integrate several checkpoints to the process to review key things. Like close to the begining you could check what approach is going to be taken, later on how it is going and what is needed. Daily meetings, like someone else suggested, are great to help people with every day issues for example.



              An important thing with these changes to the workflow though, is not to make it endless, there has to be a point where it ends. Set specific checkpoints and actions to be taken and go through with it. Even if not every tiny issue is addressed, you will be better off than right now where you have no time to fix even major issues.



              Also later on if there were things in the document or whatever is that your team is producing that were not addressed, you can hold a meeting with the 2 people involved and discuss why no one noticed those issues.



              Finally, is it worth it? I mean, it seems this has been happening for a while, maybe it is not so important that those reviews are not implemented? If it is important, discuss it with your team and tell them the immediate and long term consequences of what happened. For example the team has a poor image in the organization because they always deliver late or unpolished work; wich could have a bad impact in their careers and opportunities for advancement.






              share|improve this answer








              New contributor



              Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
              Check out our Code of Conduct.





















                3












                3








                3







                I think @sevensevens' are great suggestions, I would like to add that you need to change your process slightly. Your problem is that apparently the nature of the work of your team needs some kind of revision, but for some reason that is not part of the work that has to be done, so there is a false sense that it is done before being reviewed.



                Basically, you need to change your definition of done. I would probably discuss it with the team as everyone had suggested and see how to better fit this revisions as part of the workflow.
                This makes the revisions part of the work they have to do and not something "optional".



                For example if you are writing documents, or creating whatever kind of element that could benefit from someone else's reviews, you could add a step to the end of the process where someone else has to "review it", be it, read the document, or if it some kind of presentation see it. Then has to input their opinion, things to correct, things they liked, whatever you and your team dim appropiate, and then you leave another day after that too implement those "changes".



                In order for this to work, these reviews need to have some kind of paper trail, like if you had the tracking software suggested would be great, but with a simple email, copying you, listing the findings would be alright too. This will force a natural "earlier" deadline because now the work has to be reviewed by someone else. And cause peer pressure, because people won't want to mess with their coworkers' deadlines either.



                However if this is some kind of creative effort, it feels odd that you would wait till the end to make these reviews. It also feels odd that they are not part of the process. It would be better to integrate several checkpoints to the process to review key things. Like close to the begining you could check what approach is going to be taken, later on how it is going and what is needed. Daily meetings, like someone else suggested, are great to help people with every day issues for example.



                An important thing with these changes to the workflow though, is not to make it endless, there has to be a point where it ends. Set specific checkpoints and actions to be taken and go through with it. Even if not every tiny issue is addressed, you will be better off than right now where you have no time to fix even major issues.



                Also later on if there were things in the document or whatever is that your team is producing that were not addressed, you can hold a meeting with the 2 people involved and discuss why no one noticed those issues.



                Finally, is it worth it? I mean, it seems this has been happening for a while, maybe it is not so important that those reviews are not implemented? If it is important, discuss it with your team and tell them the immediate and long term consequences of what happened. For example the team has a poor image in the organization because they always deliver late or unpolished work; wich could have a bad impact in their careers and opportunities for advancement.






                share|improve this answer








                New contributor



                Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                Check out our Code of Conduct.









                I think @sevensevens' are great suggestions, I would like to add that you need to change your process slightly. Your problem is that apparently the nature of the work of your team needs some kind of revision, but for some reason that is not part of the work that has to be done, so there is a false sense that it is done before being reviewed.



                Basically, you need to change your definition of done. I would probably discuss it with the team as everyone had suggested and see how to better fit this revisions as part of the workflow.
                This makes the revisions part of the work they have to do and not something "optional".



                For example if you are writing documents, or creating whatever kind of element that could benefit from someone else's reviews, you could add a step to the end of the process where someone else has to "review it", be it, read the document, or if it some kind of presentation see it. Then has to input their opinion, things to correct, things they liked, whatever you and your team dim appropiate, and then you leave another day after that too implement those "changes".



                In order for this to work, these reviews need to have some kind of paper trail, like if you had the tracking software suggested would be great, but with a simple email, copying you, listing the findings would be alright too. This will force a natural "earlier" deadline because now the work has to be reviewed by someone else. And cause peer pressure, because people won't want to mess with their coworkers' deadlines either.



                However if this is some kind of creative effort, it feels odd that you would wait till the end to make these reviews. It also feels odd that they are not part of the process. It would be better to integrate several checkpoints to the process to review key things. Like close to the begining you could check what approach is going to be taken, later on how it is going and what is needed. Daily meetings, like someone else suggested, are great to help people with every day issues for example.



                An important thing with these changes to the workflow though, is not to make it endless, there has to be a point where it ends. Set specific checkpoints and actions to be taken and go through with it. Even if not every tiny issue is addressed, you will be better off than right now where you have no time to fix even major issues.



                Also later on if there were things in the document or whatever is that your team is producing that were not addressed, you can hold a meeting with the 2 people involved and discuss why no one noticed those issues.



                Finally, is it worth it? I mean, it seems this has been happening for a while, maybe it is not so important that those reviews are not implemented? If it is important, discuss it with your team and tell them the immediate and long term consequences of what happened. For example the team has a poor image in the organization because they always deliver late or unpolished work; wich could have a bad impact in their careers and opportunities for advancement.







                share|improve this answer








                New contributor



                Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                Check out our Code of Conduct.








                share|improve this answer



                share|improve this answer






                New contributor



                Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                Check out our Code of Conduct.








                answered May 10 at 13:10









                DzyannDzyann

                1312




                1312




                New contributor



                Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                Check out our Code of Conduct.




                New contributor




                Dzyann is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                Check out our Code of Conduct.























                    1














                    If you are in charge of assigning the projects and setting the deadlines then include revisions in the scope of the project. This ensures that if the revisions are not completed then the deadline for the project has not been met and disciplinary action can be taken. Of course, this only applies to cases where the employees in question are your subordinates and you assigned them the project. This also assumes that you are allotting a reasonable amount of time for you project ( including revisions ) to be completed.






                    share|improve this answer



























                      1














                      If you are in charge of assigning the projects and setting the deadlines then include revisions in the scope of the project. This ensures that if the revisions are not completed then the deadline for the project has not been met and disciplinary action can be taken. Of course, this only applies to cases where the employees in question are your subordinates and you assigned them the project. This also assumes that you are allotting a reasonable amount of time for you project ( including revisions ) to be completed.






                      share|improve this answer

























                        1












                        1








                        1







                        If you are in charge of assigning the projects and setting the deadlines then include revisions in the scope of the project. This ensures that if the revisions are not completed then the deadline for the project has not been met and disciplinary action can be taken. Of course, this only applies to cases where the employees in question are your subordinates and you assigned them the project. This also assumes that you are allotting a reasonable amount of time for you project ( including revisions ) to be completed.






                        share|improve this answer













                        If you are in charge of assigning the projects and setting the deadlines then include revisions in the scope of the project. This ensures that if the revisions are not completed then the deadline for the project has not been met and disciplinary action can be taken. Of course, this only applies to cases where the employees in question are your subordinates and you assigned them the project. This also assumes that you are allotting a reasonable amount of time for you project ( including revisions ) to be completed.







                        share|improve this answer












                        share|improve this answer



                        share|improve this answer










                        answered May 9 at 15:29









                        sf02sf02

                        12.9k72449




                        12.9k72449





















                            1















                            • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.



                            Start there.



                            Your direct boss is the person best placed to help you out and, by the sounds of it, they have direct exposure to something important that you lead.



                            If deadlines are a big problem and you feel that this is detracting from the work of the team as a whole then you should discuss it with your boss. Raise the issue, politely, and ask how they feel about . You want to get them on board with your idea so keep your options open and if possible try to get them to suggest a way forwards (most will be naturally inclined towards liking their own idea).



                            If they get on board then:



                            a) this gives you a vehicle to improve colleague performance



                            b) your manager might improve their own performance



                            Of course they might dismiss the idea that deadlines are problematic. This gives you an answer really fast: you are stuck with the problem.






                            share|improve this answer



























                              1















                              • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.



                              Start there.



                              Your direct boss is the person best placed to help you out and, by the sounds of it, they have direct exposure to something important that you lead.



                              If deadlines are a big problem and you feel that this is detracting from the work of the team as a whole then you should discuss it with your boss. Raise the issue, politely, and ask how they feel about . You want to get them on board with your idea so keep your options open and if possible try to get them to suggest a way forwards (most will be naturally inclined towards liking their own idea).



                              If they get on board then:



                              a) this gives you a vehicle to improve colleague performance



                              b) your manager might improve their own performance



                              Of course they might dismiss the idea that deadlines are problematic. This gives you an answer really fast: you are stuck with the problem.






                              share|improve this answer

























                                1












                                1








                                1








                                • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.



                                Start there.



                                Your direct boss is the person best placed to help you out and, by the sounds of it, they have direct exposure to something important that you lead.



                                If deadlines are a big problem and you feel that this is detracting from the work of the team as a whole then you should discuss it with your boss. Raise the issue, politely, and ask how they feel about . You want to get them on board with your idea so keep your options open and if possible try to get them to suggest a way forwards (most will be naturally inclined towards liking their own idea).



                                If they get on board then:



                                a) this gives you a vehicle to improve colleague performance



                                b) your manager might improve their own performance



                                Of course they might dismiss the idea that deadlines are problematic. This gives you an answer really fast: you are stuck with the problem.






                                share|improve this answer














                                • The most awkward situation - when we're in a team reporting to the big boss, which I'm supposed to be looking after, but one of the people on that team is my direct boss.



                                Start there.



                                Your direct boss is the person best placed to help you out and, by the sounds of it, they have direct exposure to something important that you lead.



                                If deadlines are a big problem and you feel that this is detracting from the work of the team as a whole then you should discuss it with your boss. Raise the issue, politely, and ask how they feel about . You want to get them on board with your idea so keep your options open and if possible try to get them to suggest a way forwards (most will be naturally inclined towards liking their own idea).



                                If they get on board then:



                                a) this gives you a vehicle to improve colleague performance



                                b) your manager might improve their own performance



                                Of course they might dismiss the idea that deadlines are problematic. This gives you an answer really fast: you are stuck with the problem.







                                share|improve this answer












                                share|improve this answer



                                share|improve this answer










                                answered May 10 at 10:35









                                P. HopkinsonP. Hopkinson

                                1,503311




                                1,503311





















                                    0














                                    If you are not a manager, then you should raise the issue at least on generic terms to management. They should start looking closer to the situation without you having to point fingers around.



                                    If you are a manager, try creating clear lines of responsibility. This means making clear who is responsible for what, and makes it easier to track with employee' performances. Make sure that tasks are not concluded just because the responsible person said so, and don't rely on reviewers to point out other people's poor deliveries.



                                    If possible, hire someone new, so that at least for a while you should know that the workload can be dealt within the available time by the team.



                                    Either way: Start assigning more tasks to people who meet deadlines, maybe even request that they work extra hours (make sure are paid to do so, do prefer the extra money instead on the usual work hour, and are aware they're being paid for it).



                                    Make clear to people not meeting deadlines that they're not allowed to work extra hours. Assign less tasks to them, and with time they'll start meeting their deadlines. If someone is still not meeting deadlines, then further reduce their workload. Anyone with common sense would know this is a foreshadowing to being fired, and should make an effort to make up for it.



                                    Don't think of this as "getting rid of rotten apples", this is not the point. At first this is just adjusting workload to everyone's capacity. Just try to give some reward to who is getting overloaded in the process, and people should go for this reward as well. If most people seem interested in having more free time at the office, then you should consider replacing someone.






                                    share|improve this answer



























                                      0














                                      If you are not a manager, then you should raise the issue at least on generic terms to management. They should start looking closer to the situation without you having to point fingers around.



                                      If you are a manager, try creating clear lines of responsibility. This means making clear who is responsible for what, and makes it easier to track with employee' performances. Make sure that tasks are not concluded just because the responsible person said so, and don't rely on reviewers to point out other people's poor deliveries.



                                      If possible, hire someone new, so that at least for a while you should know that the workload can be dealt within the available time by the team.



                                      Either way: Start assigning more tasks to people who meet deadlines, maybe even request that they work extra hours (make sure are paid to do so, do prefer the extra money instead on the usual work hour, and are aware they're being paid for it).



                                      Make clear to people not meeting deadlines that they're not allowed to work extra hours. Assign less tasks to them, and with time they'll start meeting their deadlines. If someone is still not meeting deadlines, then further reduce their workload. Anyone with common sense would know this is a foreshadowing to being fired, and should make an effort to make up for it.



                                      Don't think of this as "getting rid of rotten apples", this is not the point. At first this is just adjusting workload to everyone's capacity. Just try to give some reward to who is getting overloaded in the process, and people should go for this reward as well. If most people seem interested in having more free time at the office, then you should consider replacing someone.






                                      share|improve this answer

























                                        0












                                        0








                                        0







                                        If you are not a manager, then you should raise the issue at least on generic terms to management. They should start looking closer to the situation without you having to point fingers around.



                                        If you are a manager, try creating clear lines of responsibility. This means making clear who is responsible for what, and makes it easier to track with employee' performances. Make sure that tasks are not concluded just because the responsible person said so, and don't rely on reviewers to point out other people's poor deliveries.



                                        If possible, hire someone new, so that at least for a while you should know that the workload can be dealt within the available time by the team.



                                        Either way: Start assigning more tasks to people who meet deadlines, maybe even request that they work extra hours (make sure are paid to do so, do prefer the extra money instead on the usual work hour, and are aware they're being paid for it).



                                        Make clear to people not meeting deadlines that they're not allowed to work extra hours. Assign less tasks to them, and with time they'll start meeting their deadlines. If someone is still not meeting deadlines, then further reduce their workload. Anyone with common sense would know this is a foreshadowing to being fired, and should make an effort to make up for it.



                                        Don't think of this as "getting rid of rotten apples", this is not the point. At first this is just adjusting workload to everyone's capacity. Just try to give some reward to who is getting overloaded in the process, and people should go for this reward as well. If most people seem interested in having more free time at the office, then you should consider replacing someone.






                                        share|improve this answer













                                        If you are not a manager, then you should raise the issue at least on generic terms to management. They should start looking closer to the situation without you having to point fingers around.



                                        If you are a manager, try creating clear lines of responsibility. This means making clear who is responsible for what, and makes it easier to track with employee' performances. Make sure that tasks are not concluded just because the responsible person said so, and don't rely on reviewers to point out other people's poor deliveries.



                                        If possible, hire someone new, so that at least for a while you should know that the workload can be dealt within the available time by the team.



                                        Either way: Start assigning more tasks to people who meet deadlines, maybe even request that they work extra hours (make sure are paid to do so, do prefer the extra money instead on the usual work hour, and are aware they're being paid for it).



                                        Make clear to people not meeting deadlines that they're not allowed to work extra hours. Assign less tasks to them, and with time they'll start meeting their deadlines. If someone is still not meeting deadlines, then further reduce their workload. Anyone with common sense would know this is a foreshadowing to being fired, and should make an effort to make up for it.



                                        Don't think of this as "getting rid of rotten apples", this is not the point. At first this is just adjusting workload to everyone's capacity. Just try to give some reward to who is getting overloaded in the process, and people should go for this reward as well. If most people seem interested in having more free time at the office, then you should consider replacing someone.







                                        share|improve this answer












                                        share|improve this answer



                                        share|improve this answer










                                        answered May 9 at 17:01









                                        MefiticoMefitico

                                        1,0521416




                                        1,0521416





















                                            0














                                            • Hire a project manager per ~10 people in a project.

                                            • His main job is to map "customer deadlines" to internal deadlines

                                            • Also have some "Product owner"-like function which actually defines the acceptance criteria of the internal work.





                                            share|improve this answer



























                                              0














                                              • Hire a project manager per ~10 people in a project.

                                              • His main job is to map "customer deadlines" to internal deadlines

                                              • Also have some "Product owner"-like function which actually defines the acceptance criteria of the internal work.





                                              share|improve this answer

























                                                0












                                                0








                                                0







                                                • Hire a project manager per ~10 people in a project.

                                                • His main job is to map "customer deadlines" to internal deadlines

                                                • Also have some "Product owner"-like function which actually defines the acceptance criteria of the internal work.





                                                share|improve this answer













                                                • Hire a project manager per ~10 people in a project.

                                                • His main job is to map "customer deadlines" to internal deadlines

                                                • Also have some "Product owner"-like function which actually defines the acceptance criteria of the internal work.






                                                share|improve this answer












                                                share|improve this answer



                                                share|improve this answer










                                                answered 2 days ago









                                                SaschaSascha

                                                10.1k22443




                                                10.1k22443



























                                                    draft saved

                                                    draft discarded
















































                                                    Thanks for contributing an answer to The Workplace Stack Exchange!


                                                    • Please be sure to answer the question. Provide details and share your research!

                                                    But avoid


                                                    • Asking for help, clarification, or responding to other answers.

                                                    • Making statements based on opinion; back them up with references or personal experience.

                                                    To learn more, see our tips on writing great answers.




                                                    draft saved


                                                    draft discarded














                                                    StackExchange.ready(
                                                    function ()
                                                    StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f136280%2fhow-can-i-avoid-subordinates-and-coworkers-putting-off-tasks-until-the-last-minu%23new-answer', 'question_page');

                                                    );

                                                    Post as a guest















                                                    Required, but never shown





















































                                                    Required, but never shown














                                                    Required, but never shown












                                                    Required, but never shown







                                                    Required, but never shown

































                                                    Required, but never shown














                                                    Required, but never shown












                                                    Required, but never shown







                                                    Required, but never shown











                                                    Popular posts from this blog

                                                    Category:9 (number) SubcategoriesMedia in category "9 (number)"Navigation menuUpload mediaGND ID: 4485639-8Library of Congress authority ID: sh85091979ReasonatorScholiaStatistics

                                                    Circuit construction for execution of conditional statements using least significant bitHow are two different registers being used as “control”?How exactly is the stated composite state of the two registers being produced using the $R_zz$ controlled rotations?Efficiently performing controlled rotations in HHLWould this quantum algorithm implementation work?How to prepare a superposed states of odd integers from $1$ to $sqrtN$?Why is this implementation of the order finding algorithm not working?Circuit construction for Hamiltonian simulationHow can I invert the least significant bit of a certain term of a superposed state?Implementing an oracleImplementing a controlled sum operation

                                                    Magento 2 “No Payment Methods” in Admin New OrderHow to integrate Paypal Express Checkout with the Magento APIMagento 1.5 - Sales > Order > edit order and shipping methods disappearAuto Invoice Check/Money Order Payment methodAdd more simple payment methods?Shipping methods not showingWhat should I do to change payment methods if changing the configuration has no effects?1.9 - No Payment Methods showing upMy Payment Methods not Showing for downloadable/virtual product when checkout?Magento2 API to access internal payment methodHow to call an existing payment methods in the registration form?